Petro-Ex Canada Inc. Design, Engineering, Fabrication, Supply and Installation of Crude Oil & Gas Processing Equipment

Early Production Facility (EPF) K01 Sarir Field

Description: Supply of Equipment and Material for New Satellite Stations at Sarir GC-2 and GC-4
Client: Arabian Gulf Oil Company of Libya (AGOCO)
Year: 2009
Project Scope: Designing, Engineering, Procurement of material, Fabrication and transfer of goods to the client's site, pre-commissioning/commissioning of new oil-field equipment.

Design, Engineering, Supply of Material, Fabrication and Coating of:

  • One (1) Horizontal Test Separator (10,000 BPD)
  • Manifolds for GC-2 Satellites: Eight (8) fully assembled, 6-Slot Skid mounted Manual Manifolds
  • Manifolds for GC-4 Satellites: Four (4) fully assembled, 6-Slot, skid mounted Manual Manifolds
  • Instrument Air Package for GC-Satellite: One (1) instrument Air package, consisting of an Air Compressor (Capacity of 25 SCFM)
  • Chemical Injection Skid for GC-2 Satellite: Two (2) Chemical Injection skids
  • Chemical Injection Skids for GC-4 Satellites: One (1) Chemical Injection skid
  • Launcher/Receiver skid mounted Package: One (1) 16" x 12" (NPS) Scraper launcher and one (1) 16" x 12" (NPS) Scraper receiver

Contact Us

If you have any additional questions, please feel free to contact our team. Our response time is usually within 24-48 hours.

Questions? Contact Us