Petro-Ex Canada Inc. Design, Engineering, Fabrication, Supply and Installation of Crude Oil & Gas Processing Equipment
Business Activities


Manifolds

CPPE has designed, fabricated and installed numerous manifolds for use in upstream oil and gas production.

  • Manifold is typically a junction of pipes and valves which are used to safely divert oil or gas to various destinations without flow interruptions.

Diversion of flow line from:

  • Oil field well head to production/test separator
  • A separator to flare for disposal or gas recovery unit
  • From separator to a tank for measurements or storage
  • Separator to a production line

  • Automatic manifolds
  • Manual manifolds

  • Skid mounted platform
  • Multi production headers, Test header, Drain header
  • Instrumentation and local control panel

Contact Us

If you have any additional questions, please feel free to contact our team. Our response time is usually within 24-48 hours.

Questions? Contact Us